Location

Bogota, Colombia

Completion Date

2019

Tonnage

9500

General Contractor

Arpro, EllisDon

Architect

Rogers Stirk Harbour + Partners

Owner

QBO S.A.S.

Atrio, North Tower

Currently under construction, the Atrio Office Towers complex stands-out in terms of complexity, design assistance and location.

 

Steel is currently being erected at the 44-story office tower project in Bogota Colombia. Supermétal has teamed up with 2 local fabricators who produce the beams while Supermétal is fabricating the complex nodes of the diagrid. The company’s own Construction Division is erecting the building aided by a local Colombian workforce.

Supermétal’s client is a consortium of leading Colombian and Canadian builders Arpro and EllisDon. ARUP, PyD and Rogers Stirk Harbour are the engineers and architects.

Design Assist Elements

  • The complex diagrid design requires large connection plates at the nodes, encased by pipe. 
     

  • Supermétal has custom-designed a temporary shoring column featuring a 250-ton hydraulic jack.
     

  • In-floor tower crane tie-back system.