PETROCHEMICAL

004 (2).JPG
Nexen- CNOCC Multi-year Agreement
  • Multi-year agreement starting in 2012.
     

  • 3D model-shop drawing approval process utilized.
     

  • Produced pre-assemblies in Leduc plant, depicted above.
     

  • Fabricated over 1400 MT in 6 months for various projects and EPC firms.

Horizon EHouse.jpg
CNRL E-House
  • 600 t Stand-alone building

  • Contract included for roof and wall sandwich panel cladding

  • 2 separate contract additions

  • Project finished ahead of schedule

DSC02252.JPG
MEG Energy Christina Lake 2B

Built for WorleyParsons and MEG Energy, Supermétal assembled over 30 platforms and 4 stair towers at our Leduc facility. The pres-assemblies are part of a 7500-ton contract that was fabricated between March-December 2011.

CCRL Refinery 2012.jpg
CCRL Refinery Expansion

Supermétal completed the installation of 850 tonnes of structural steel, in 5 main areas. This project brought challenges for steel erection due to the proximity to the operational existing buildings and the adjacent railway.

Shell AOSP3.jpg
Shell AOSP

Manufacturing and installation of the structural steel for the Scotford Shell refinery in Alberta.

Tons of structural steel: 12,000

Category: industrial

Client: Bechtel/Shell

AOSP Expansion Construction: 2007-2012