Built for WorleyParsons and MEG Energy, Supermétal assembled over 30 platforms and 4 stair towers at our Leduc facility. The pres-assemblies are part of a 7500-ton contract that was fabricated between March-December 2011.
Supermétal completed the installation of 850 tonnes of structural steel, in 5 main areas. This project brought challenges for steel erection due to the proximity to the operational existing buildings and the adjacent railway.