WAREHOUSES / LOGISTICS CENTRES


As of April 2021

Supermetal Construction Inc. is erecting steel on 2 of Canada's largest warehouses:

  1. Montreal - A peak workforce of 90 Ironworkers are installing 7000 MT of steel joists and deck in under 4 months.
     

  2. Vancouver- 11,000 metric tonnes are being erected for Canada's first multi-level warehouse. The large heated ramp will enable truck traffic to drive up to the upper level. Large 6', 1800mm, beams are designed to support the upper loading dock.

 

Call us today to for early design and schedule consultation.