top of page
Schulich-School-of-Engineering-Calgary-winter

Schulich-School-of-Engineering-Calgary-winter

Common Area4

Common Area4

Schulich Crew

Schulich Crew

Schulich Transfer Truss

Schulich Transfer Truss

Roof Truss Assembly

Roof Truss Assembly

X-brace

X-brace

Common Area2

Common Area2

Common Area3

Common Area3

Transfer Truss1

Transfer Truss1

Location

Calgary, AB

Completion Date

2016

Tonnage

550

General Contractor

EllisDon

Architect

Pivotal / Gibbs Gage

Engineer

RJC

U of C Schulich School of Engineering

A major expansion of approximately 180,000 sq ft, and renovations to approximately 100,000 sq ft of the existing engineering complex. Opened in the fall of 2016, the new facility enables the University of Calgary’s Schulich School of Engineering to educate an additional 400 undergraduate and graduate students, provides interactive design labs, expands student study spaces and adds two floors of research labs.

 

The $174 million renovation and expansion is an investment in the future of Alberta and Canada.

Starting at the end of 2014 Supermétal began erecting steel in phases until September 2015. The new Atrium features 2-50ft X-Braces which will be a feature attraction to the 550 tonne building.

Winner of the CISC Engineering Award in 2017.

 

CISC 2017   Architecture   Schulich School   Final Edit

CISC 2017 Architecture Schulich School Final Edit

Play Video
bottom of page