top of page

B.M.C. Durfee High School, Fall River, Massachusetts


Supermétal is currently fabricating 3000 tons of steel for a new 3 floor 500,000 square foot,

high school. This structure will replace an existing aging school and will be designed to accommodate 2,500 students. The $250 M high school integrates the original design elements of the bell tower, arched windows, hip roof and an observatory deck.


The school is located about 80 Km’s south of Boston and the contract is with a leading General Contractor - Suffolk.



bottom of page